top of page

Announcements

公開·290 位會員

107 次瀏覽
136 次瀏覽
133 次瀏覽

Update From Chris 25/9/25

Dear All


It’s time to catch up with the progress being made here at RevoHQ.


Personal Update


Firstly, I have, since my last update, undertaken a second procedure on my heart where the consultant fitted a 33mm x 3mm stent in one of my coronary arteries. This had an immediate effect, allowing whole movements to be performed without fatigue. I am so grateful to the consultant and his medical team.


Regarding Charlie, our new engineer, he has continued to grow into the role and has since started his Engineering Manufacturing Technician Level 4 course, which we are supporting him with.


Design & Testing


217 次瀏覽

Would love some routine regular updates instead of failed promises that products will be shipping “very soon”. I’ve sent an email about the lite I received and how it was unsolvable with no response. Hopeful with the new year we get some better answers. Hopefully the next lite I get can actually be solved. This was “solved” I had to use a tweezers to grab the pin and pull it to get the core to come out . Email was sent on 7/26/2025


會員

bottom of page